Project Applications

Yulin Yuyang Airport Phase II Expansion Project Terminal

Location

Yuyang, China

Owner

Western Airport Group

General Contractor

Northwest Airport Group Construction Company

Architect

-

Engineering Consultant

JINGGONG Group

Construction Period

2015 - 2017

Type of Project

Airport Terminal

Size of Structure

28m Height

Main features used in this application Construction stage analysis with prestressed tendon Linear dynamic analysis with response spectrum

Description on this project

The project has 42,500㎡ area, located in Yulin City. The main body is a concrete frame structure and the roof is a large span steel structure. The roof is a string arch structure made with two box-shaped steel beams, high-strength steel wire string, a pole for the triangle, and a round steel pipe.

 

 
 
 

Yulin Yuyang Airport Phase II Expansion Project Terminal_1

 

Yulin Yuyang Airport Phase II Expansion Project Terminal_2

 

 

 

 

Yulin Yuyang Airport Phase II Expansion Project Terminal-1

 

 

                                                                                                 

 

Project Contact JINGGONG Group
  • Address

    Jinggong Plaza, No.112 Jinkeqiao Road, Keqiao, Shaoxing City, Zhejiang Province, China

  • Introduction

    The company was found in 1968. It is located in Shaoxing now and has built up its predominant industries and grown into a large-sized hi-tech global-marketoriented enterprise. They focus on its dominant industries of steel structure building and equipment manufacture.

  • Website

    www.jinggonggroup.com

  • Email

    info@jinggonggroup.com