This is banner's subtitle text.
This is banner's subtitle text.
The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
TrainingTake basic to anvanced training courses on midas solutions
EventsTechnical seminars and webinars by structure experts
This is banner's subtitle text.
In order to realize the concept of "stacking while shifting", the wall girder is assembled in a parallel cross shape of 20.4m in length and width. It is a frame in which it is shifted by half span. In addition, earthquake resistant cores are connected to each other with a wall girder and the entire frame is used as a super ramen frame.
Yoshino Building 3F, 8-13 Yonban-cho, Chiyoda-ku, Tokyo 102-0081, Japan
The firm was established in 1988. Through the structural design, they work hard to achieve their purpose while working with clients, architects, facility designers, and constructors as much as possible.