Project Applications

Songdo Centroad

Location

Incheon, Korea

Owner

SK Networks

General Contractor

POSCO E&C

Architect

Gansam / Heerim Architects & Planners

Engineering Consultant

MIDAS IT / POSCO E&C

Construction Period

2008 - 2011

Type of Project

Mixed-use Building

Size of Structure

190m Height (45-story)

Main features used in this application Construction stage analysis with creep and shrinkage RC building design as per KCI-USD

Description on this project

Songdo Centroad is composed of 3 buildings. Building A (45 floors) and B (34 floors) are office buildings and building C (33 floors) is a residential building. The buildings were completed in 2011 with a total floor area of 201,952㎡ Total construction cost was 370 billion won.

 

 

  songdo centroad-4

 

                                                                                                 

 

Project Contact MIDAS IT
  • Address

    MIDAS IT Tower, 17, Pangyo-ro 228 beon-gil, Bundang-gu, Seongnam-si, Gyeonggi-do, 13487, Korea

  • Introduction

    MIDAS IT specializes in engineering consultancy, web business, and CAE software development. MIDAS IT provides world-class consultancy services in the fields of civil, structural, geotechnical, and mechanical engineering.

  • Website

    www.midasuser.com

  • Email

    info@midasit.com