Project scope and Key points.
Project Information:
Peoria Street Bridge
- 3-span, continuous, galvanized steel plate girder bridge
- Precast Deck Panel bridge with UHPC joints
- Semi-integral abutment on tall wall
Key Points:
- UHPC application
- Full depth precast deck panel
- Internal and external post-tensioning, UHPC joints.
Presentation Slides
|
Speaker : David Liu, PE, SE, PhD Category : Bridge Software : midas Civil Date : 2016-10-05 |