IAStructE-1MIDAS LOGO - Original-1

MIDAS Expert Webinar

in Association with IAStructE

Modelling, Analysis & Design of Extradosed Bridge in midas Civil

- A Case Study

 

Date - 24th August 2022

Time - 11:30 AM - 12:30 PM (IST)

There has been a phenomenal increase in the transportation infrastructure industry in the recent past and there are a number of elevated corridors and bridges built. Focusing specifically on long-span bridges, Extradosed type bridge is very much suitable for spans upto to 200m and also adds aesthetic value.


An Extradosed bridge comprises of both prestressed concrete box girder and elements of cable stayed bridge. In the numerical modelling, there are certain fundamentals which are to be considered. This webinar will be delivered by an expert from the industry who has worked on multiple long-span bridge projects.

AGENDA

- Brief description of modelling of Extradosed Bridge.
- Construction Stage Analysis.
- Consideration of time dependent material properties in analysis.
- Service Stage Analysis.
- Longitudinal Analysis & Design of box girder.

 


 

 

EXPERT SPEAKER

Devjyoti Paul-1Er. Devjyoti Paul

B.Tech (NIT Jaipur), M.Engg (The University of Tokyo, Japan)

Project Manager  - B&S Engineering Consultants Pvt. Ltd, Noida

He has worked on a number of eminent projects. And to list a few: Extradosed Bridge over River Brahmaputra, Extradosed Bridge over River Ganga at Prayagraj, U-Section based Multi-Sectional interchange at Patna, Purvanchal Expressway Package, Bowstring Girder ROB on Delhi-Meerut Expressway.

 

This Event has been completed, to view recorded session contact jeet@midasit.com